ExcelReady
CourseMock testsFunction guidesBlog
Start freeStart learning for free
ExcelReady

Be Excel-ready before day one. Hands-on practice in your browser, with instant feedback.

Learn

  • Course
  • Mock tests
  • Function guides
  • Blog

Test prep

  • Excel level test
  • Excel test practice
  • Free screening quiz
  • Certificate

Company

  • About
  • Editorial policy
  • Contact
  • Terms
  • Privacy

© 2026 ExcelReady. All rights reserved.

  1. Blog
  2. Projects
  3. How to Build an SLA Tracker in Excel With Working Hours

How to Build an SLA Tracker in Excel With Working Hours

By ExcelReady Team·Updated November 3, 2026·7 min read

The short answer

An SLA tracker in Excel lists each ticket with its opened date, SLA length and resolved date. WORKDAY adds the SLA in business days to get the due date, and IF compares the resolved date with it to show Met or Breached. For SLAs in hours, a NETWORKDAYS formula measures working hours. Conditional formatting colours the breaches.

Key takeaways

  • Due date for a business-day SLA: =WORKDAY(Opened, SLA days, Holidays).
  • Status: =IF(Resolved<=Due,"Met","Breached"), with an extra check for tickets that are still open.
  • NETWORKDAYS counts both the start and the end day, so subtract 1 to get business days taken.
  • For SLAs in hours, measure working hours with NETWORKDAYS, MOD and MEDIAN, then compare with the SLA hours.
  • A formula rule such as =$F2="Breached" colours a whole row in conditional formatting.
On this page+
  1. What an SLA tracker needs
  2. Calculate the due date with WORKDAY
  3. Show Met or Breached with IF
  4. SLAs in working hours
  5. Highlight breaches with conditional formatting
  6. Summarise SLA performance
  7. Practise it

An SLA tracker in Excel shows, for every ticket or request, when it was due and whether you met the deadline. An SLA (service level agreement) is a promise such as "we resolve tickets within 2 business days" or "we reply within 4 working hours". This guide builds the tracker step by step: WORKDAY for due dates, IF for the status, a working-hours formula for hour-based SLAs, and colour rules that flag breaches.

What an SLA tracker needs#

An SLA tracker needs one row per ticket and a few columns that formulas can work from. Keep the inputs on the left and the calculated columns on the right:

ColumnHoldsTyped or formula?
A: TicketThe ticket IDTyped
B: OpenedDate the ticket arrivedTyped
C: SLA daysBusiness days allowedTyped or looked up from the priority
D: ResolvedDate it was closed (blank if open)Typed
E: DueThe deadlineFormula
F: StatusMet, Breached, Open or OverdueFormula

Turn the range into an Excel Table (Ctrl+T, or ⌘T on a Mac) so new rows pick up the formulas automatically. If the SLA depends on priority, keep a small table of priorities and days and fill column C with XLOOKUP. The same layout works for a general task tracker, with deadlines in place of SLAs.

Here is the sample data. 2 November 2026 is a Monday.

ABCD
1TicketOpenedSLA daysResolved
2T-101Mon 2 Nov 20261Tue 3 Nov 2026
3T-102Thu 5 Nov 20262Tue 10 Nov 2026
4T-103Fri 6 Nov 20263Wed 11 Nov 2026
5T-104Mon 9 Nov 20261Wed 11 Nov 2026
6T-105Tue 10 Nov 20265(open)

Calculate the due date with WORKDAY#

WORKDAY adds a number of business days to a date and skips Saturdays and Sundays. In E2, type:

Excel formula
=WORKDAY(B2,C2)

Fill it down and format column E as a date. T-102 was opened on a Thursday with 2 days, so it is due on Monday 9 November: Friday is day 1, the weekend is skipped, Monday is day 2. T-103 (Friday plus 3) is due on Wednesday 11 November, and T-105 on Tuesday 17 November.

WORKDAY starts counting the day after the opened date. To skip public holidays, list them in a range such as H2:H10 and add it as the third argument: =WORKDAY(B2,C2,$H$2:$H$10). The WORKDAY function guide lists every argument, and the article on NETWORKDAYS and WORKDAY compares the two.

Show Met or Breached with IF#

IF compares the resolved date with the due date and returns a label. For closed tickets, the core formula is:

Excel formula
=IF(D2<=E2,"Met","Breached")

T-101 and T-103 were resolved on their due dates, so they show Met. T-102 (resolved Tuesday 10, due Monday 9) and T-104 (resolved Wednesday 11, due Tuesday 10) show Breached.

A real tracker also has open tickets, where D is blank. Nest a second IF so they don't show as Met by accident:

Excel formula
=IF(D2="",IF(TODAY()>E2,"Overdue","Open"),IF(D2<=E2,"Met","Breached"))

Read it from the left: if there is no resolved date, the ticket is Overdue once today is past the due date, otherwise Open. If there is a resolved date, it is Met or Breached. See the IF function guide for how nested IFs work.

To report how many business days a ticket took, use NETWORKDAYS and subtract 1, because NETWORKDAYS counts both the start and the end day:

Excel formula
=NETWORKDAYS(B2,D2)-1

T-102 gives 4 − 1 = 3 business days, one more than its SLA. The NETWORKDAYS function guide has more examples.

SLAs in working hours#

When the SLA is in hours, such as "respond within 4 working hours", you need the working hours between two date-times. Put the opened date-time in B2 and the response date-time in D2, and the office hours in J1 (9:00) and J2 (17:00). This formula returns the working hours between them:

Excel formula
=((NETWORKDAYS(B2,D2)-1)*($J$2-$J$1)
  +IF(NETWORKDAYS(D2,D2),MEDIAN(MOD(D2,1),$J$2,$J$1),$J$2)
  -MEDIAN(NETWORKDAYS(B2,B2)*MOD(B2,1),$J$2,$J$1))*24

MOD(D2,1) takes the time part of a date-time, MEDIAN clips it into office hours, and NETWORKDAYS counts the full working days in between. The guide on working hours between two dates explains each part.

For example, a ticket opened on Monday 2 November 2026 at 15:00 and answered on Tuesday 3 November at 11:00 took 2 hours on Monday and 2 on Tuesday: 4 working hours. If the elapsed hours are in G2 and the SLA hours in C2, the status is the same IF as before:

Excel formula
=IF(G2<=C2,"Met","Breached")

Overnight hours and weekends don't count against you, which is how most hour-based SLAs are written. If your team works a different week, such as Sunday to Thursday, use NETWORKDAYS.INTL and WORKDAY.INTL with a weekend code instead.

Highlight breaches with conditional formatting#

Conditional formatting colours rows so problems stand out without reading every cell. To colour every breached row red:

  1. Select the data rows, for example A2:F100.
  2. Go to Home > Conditional Formatting > New Rule.
  3. Choose Use a formula to determine which cells to format.
  4. Type =$F2="Breached", pick a light red fill and click OK.

The $ before F locks the column, so every cell in the row checks column F. Add a second rule, =$F2="Overdue", in orange for open tickets past their deadline. For a warning before the deadline, =AND($D2="",$E2-TODAY()<=1) highlights open tickets due within one day. The guide to highlighting overdue dates has more rules like these.

Summarise SLA performance#

A tracker is most useful with a few summary numbers at the top. With statuses in F2:F100:

MeasureFormulaSample result
Tickets met=COUNTIF(F2:F100,"Met")2
Tickets breached=COUNTIF(F2:F100,"Breached")2
SLA met rate=COUNTIF(F2:F100,"Met")/(COUNTIF(F2:F100,"Met")+COUNTIF(F2:F100,"Breached"))50%
Open tickets=COUNTIFS(A2:A100,"<>",D2:D100,"")1

The met rate divides by closed tickets only, so open tickets don't drag it down before they are due. Add COUNTIFS by priority or by agent to see where breaches happen. These are the everyday numbers behind Excel skills for customer service roles.

Practise it#

The tracker rests on three skills. Practise NETWORKDAYS and WORKDAY in a live spreadsheet to get due dates and business days right, then the IF function lesson for Met and Breached labels, and the conditional formatting lesson for colour rules. Each one checks your formula instantly. Start with the exercise on this page: one ticket, one due date, one status.

Try it yourself

This is a live spreadsheet. Type the formula in the green cell and press Enter.

Ticket T-102 was opened on B3 with a 2-business-day SLA (C3). In E3, show Met if it was resolved (D3) on or before its WORKDAY due date, otherwise Breached.

fx
ABCDEF
1
Ticket
Opened
SLA days
Resolved
Status
2
T-101
46328
1
46329
3
T-102
46331
2
46336
4
T-103
46332
3
46337
5
T-104
46335
1
46337
6
7
8

Tip: WORKDAY(B3,C3) gives the due date. IF compares D3 with it and returns "Met" or "Breached".

Practise this in a lesson

LessonWorkdays: NETWORKDAYS and WORKDAYCount working days between two dates with NETWORKDAYS and find a deadline a number of working days away with WORKDAY, skipping weekends and a holiday list.LessonThe IF functionMake a cell show one result or another depending on a condition, like Pass/Fail or Over/Under budget.LessonConditional formattingMake important numbers stand out: highlight values over a limit, duplicate IDs and the top 3, then color whole rows with a formula rule and a $ on the column.Function guideNETWORKDAYSCount the working days between two dates with Excel's NETWORKDAYS, excluding weekends and holidays. Examples, pitfalls and a live exercise.Function guideWORKDAYFind a delivery or due date a number of working days away with Excel's WORKDAY, skipping weekends and holidays. Examples and live practice.Function guideIFLearn Excel's IF function with practical examples: flag budgets, label rows and return blanks. Avoid the classic mistakes and practice live.

Frequently asked questions

How do I calculate an SLA due date in Excel?

+

For an SLA in business days, use =WORKDAY(B2,C2), where B2 is the opened date and C2 is the number of business days allowed. Add a holiday range as the third argument to skip public holidays.

How do I calculate SLA in working hours in Excel?

+

Measure the working hours between the opened and resolved times with a formula built from NETWORKDAYS, MOD and MEDIAN, then compare the result with the SLA hours using IF. The formula skips nights, weekends and, if you list them, holidays.

How do I calculate the SLA met percentage?

+

Divide the number of Met tickets by the number of closed tickets, for example =COUNTIF(F2:F100,"Met")/(COUNTIF(F2:F100,"Met")+COUNTIF(F2:F100,"Breached")), and format the cell as a percentage.

Does WORKDAY include the start date?

+

No. WORKDAY counts forward from the day after the start date, so a ticket opened on Monday with a 1-day SLA is due on Tuesday. NETWORKDAYS, in contrast, counts both the start and end dates.

Sources

  • WORKDAY function - Microsoft Support
  • NETWORKDAYS function - Microsoft Support
  • Use conditional formatting to highlight information - Microsoft Support

Written and checked by the ExcelReady Team. First published November 3, 2026. The practice exercise runs in the same formula engine as our lessons. Found a mistake? Read our editorial policy or email hello@excelready.app.

On this page

  1. What an SLA tracker needs
  2. Calculate the due date with WORKDAY
  3. Show Met or Breached with IF
  4. SLAs in working hours
  5. Highlight breaches with conditional formatting
  6. Summarise SLA performance
  7. Practise it

Keep reading

Dates· 7 min read

Calculate Working Hours Between Two Dates in Excel

For whole days, count the working days and multiply by the hours in a working day: =NETWORKDAYS(A2,B2,holidays)*8. When the start and end include times, use a formula that counts the full days in between and then adds the part-days at each end, clipped to working hours with MEDIAN. Multiply the result by 24 to get hours.

Dates· 6 min read

Count Working Days With NETWORKDAYS and WORKDAY

NETWORKDAYS counts the working days (Monday to Friday) between two dates, including both dates: =NETWORKDAYS(start_date, end_date, [holidays]). WORKDAY does the reverse and returns the date a number of working days away: =WORKDAY(start_date, days, [holidays]). Both skip weekends, and both skip any dates you list as holidays.

Dates· 5 min read

Highlight Overdue and Upcoming Dates in Excel

To highlight overdue dates in Excel, select the rows, go to Home > Conditional Formatting > New Rule, choose Use a formula, and enter =AND($C2<>"",$C2<TODAY()), where C holds the due dates. Pick a red fill. For dates due within the next 7 days, add a second rule: =AND($C2>=TODAY(),$C2<=TODAY()+7). The colours update every day.

More on projects

  • How to Split Shared Expenses in Excel Between Friends
  • How to Build a Stock Portfolio Tracker in Excel
  • Build a Subscription Tracker in Excel
  • How to Analyse Survey Results in Excel
  • Build a Task Tracker in Excel With Status and Due Dates
  • Make a Simple Timesheet in Excel With Formulas
All projects articles →

Don't just read about Excel. Do it.

Practise real formulas in a live spreadsheet with instant feedback, right in your browser. Nothing to download.

Start learning for free